Postponed – AESO Restructured Energy Market (REM) Design Release
CALGARY, Alberta, Aug. 18, 2025 (GLOBE NEWSWIRE) -- The Alberta Electric System Operator (AESO)’s media briefing has been postponed due to scheduling conflicts, and that the AESO will reschedule when a new date is selected.
Contact: | AESO Media Relations at media@aeso.ca |
www.aeso.ca
X (Twitter): @theaeso
The Alberta Electric System Operator is responsible for the safe, reliable, and economic planning and operation of the Alberta Interconnected Electric System. We provide open and non-discriminatory access to Alberta’s interconnected power grid, and we also facilitate Alberta’s competitive wholesale electricity market.

Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.
